Module 10 · Capstone and career · Chapter 81 · Free
Portfolio, proof of work and the FDE interview
- Hiring managers cannot interview a claim. They can interview proof: a write-up, a demo and a repo.
- Your capstone already contains all three. This chapter packages it.
- Then you prepare for what FDE loops actually test: customers, constraints and debugging, not trivia.
Picture: a finished house with no photos, no address and the lights off. The work is real. Nobody can see it.
- Why a finished capstone still fails to get interviews, with the market numbers.
- The three proof assets: a case study with numbers, a demo recording and a clean repo.
- One capstone's journey from shipped build to hiring loop.
- A lab: turn your capstone into a one-page case study.
- What the hiring loop actually tests, your STAR stories, and a 30-day plan.
After this chapter you can:
- Package a build into three proof assets a stranger can judge in five minutes.
- Write a one-page case study with before and after numbers, constraints and tradeoffs.
- Name what each stage of an FDE hiring loop tests, and walk in with STAR stories ready.
- Run a 30-day plan after the course, ending with an updated skill-gap map.
Next: the words you will see.
Words you'll meet
- Portfolio
- The small set of finished work you show on purpose, chosen to prove the skills a role needs. Example: one strong capstone case study beats twelve half-finished tutorial repos.
- Proof of work
- Evidence a stranger can inspect, not a claim they have to trust. Example: a demo recording, a repo with a real README, and an eval score that went from 61 to 89 percent.
- Case study write-up
- A short, structured account of one build: the problem, the constraints, what you built, and the measured result. Example: one page a hiring manager can read in four minutes.
- STAR story
- An interview answer shaped as Situation, Task, Action, Result. Example: "Our eval set failed on refund questions (situation), I owned the fix (task)..." told in two minutes.
- System design interview
- A session where you design a system out loud under stated constraints, while the interviewer changes them. Example: "Design a support assistant for a bank. Data cannot leave their cloud. Now the budget halves."
- Take-home
- A small build or write-up done at home between interview stages, usually time-boxed. Example: four hours to build a tiny retrieval system and write up your choices.
- Hiring loop
- The full sequence of interviews for one role, each stage testing something different. Example: recruiter screen, customer roleplay, system design, live debugging, final panel.
- Reference story
- The account a former manager or teammate will give about working with you, which should match your own stories. Example: your reference mentions the same launch you describe, with the same result.
- Skills matrix
- A grid scoring your own skills against what roles ask for, so gaps are visible and plannable. Example: the map you built in Chapter 6, re-scored after the capstone.
Next: why the market rewards proof, not claims.
Step 1: The market, and the three proof assets
Start with the market you are entering, because it shapes what proof you need. The jobs data tracked on this site counts 367 open FDE roles, with a median posted base pay of $243K. Hiring is concentrated at a small set of companies, with OpenAI, Palantir, Databricks and Anthropic doing much of it. Chapter 2, "Company archetypes and reading a posting", showed how to read those postings closely. Two consequences follow. First, each role draws many applicants, so a first screen lasts seconds, not minutes. Second, the pay level means nobody hires on potential alone. Every stage of the loop is designed to answer one question: has this person actually done the work, with a customer, under constraints?
A CV bullet cannot answer that. "Built a RAG chatbot" is a claim. Claims are free, and screeners price them accordingly. What answers the question is proof of work: artifacts a stranger can open, inspect and judge without trusting you. For an FDE candidate, three assets do almost all of the work:
- A public write-up with numbers. The case study from the lab below: the problem, the constraints, what you built, and measured results, before and after. Numbers are what separate a build from a tutorial. "Eval pass rate rose from 61 to 89 percent on a 120-question golden set" can be discussed, challenged and believed. "Improved accuracy" cannot.
- A demo recording. Five to seven minutes, recorded once, watchable any time. It proves the system runs, and it shows how you talk about it, which is half the FDE job. Chapter 62, "Demo craft", covers how to run a demo that lands: start from the customer's pain, show the failure mode as well as the success, and narrate decisions, not clicks.
- A clean repo. Not a tidy one, a legible one: a README that says what the system does, how to run it and what you would do next; a sensible folder structure; secrets removed; the eval script runnable. Reviewers read repos the way customers read proposals. A messy repo says the handover would be messy too.
Notice what is not on the list: more projects. One capstone packaged three ways beats five new half-builds, because depth is what the loop tests. You already did the hard part in Chapter 79 and shipped and reviewed it in Chapter 80, "Demo, review and shipping the capstone". This chapter is about making that work visible.
The rule of this chapter: never make a claim in an application or an interview that you cannot back with an artifact the other person can open. If the artifact does not exist yet, building it is the next task, ahead of any new application.
Next: the journey from shipped capstone to hiring loop, one stage at a time.
Step 2: From capstone to hiring loop
Packaging is a pipeline, like any other system in this course. Each stage turns the same build into a form the next audience can use. Press next to walk it through.
On a phone, swipe the picture sideways.
- The capstone works and was reviewed in Chapter 80. Done, here, means shipped and measured, not perfect.
- One page: problem, constraints, build, numbers. This is the lab in the next step, and it is the single highest-value hour in this chapter.
- Add the demo recording and the cleaned repo. A screener can now judge the work in five minutes, without you in the room.
- Every hard moment in the build is an interview answer waiting to be shaped: the bug, the tradeoff, the cut, the failure.
- The loop tests the same work from five angles. The proof pack gets you in; the stories and the live sessions carry you through.
- Offer or rejection, the loop returns information. It goes into the 30-day plan and the re-scored skills matrix, not into a drawer.
Where the picture breaks down: the pipeline looks one-way, but real candidates loop inside it. A roleplay that goes badly sends you back to the stories. A design session that exposes a gap sends you back to the build. That is normal, and it is why the last stage feeds the first.
Next: the lab, where your capstone becomes a one-page case study.
Step 3: Lab: turn the capstone into a one-page case study
Why: the case study is the asset every other asset hangs off. The demo follows its structure, the README opens with its summary, and your STAR stories are its paragraphs told out loud.
One page is a hard limit, and that is the point. A hiring manager will give you four minutes. A page that respects that gets read to the end. Use this skeleton, in this order:
Case study: [system name], one page
Problem: Who hurts, doing what, and what it costs them.
One or two sentences, with a number if you have one.
Context: The constraints you built under: data, budget,
latency, privacy, the stack already in place.
Built: What the system does, in three lines. Architecture
in one small diagram or five bullet points.
Decisions: Two or three tradeoffs you chose on purpose,
and what you gave up with each.
Results: Before and after numbers: eval scores, latency,
cost, error rates. State how each was measured.
Failure: One thing that broke or scored badly, and the fix.
Next: What you would build next, and what you would
need from the customer to build it.
Do this:
- Open your capstone notes and pull out every number you actually measured: eval scores, latency, cost per query, document counts, error counts. If a number was never measured, leave a gap. Do not fill gaps from memory or optimism.
- Write the Problem and Context sections first. Name the user, the task and the cost of the old way, then list the constraints exactly as they were, including the awkward ones.
- Write Built in three lines, then Decisions. Pick the two tradeoffs a senior engineer would ask about, and state what each one cost you.
- Write Results as before and after pairs, each with its measurement method in the same sentence: "pass rate on a 120-question golden set, run weekly".
- Write the Failure section honestly. Every real build has one. A case study with no failure reads as a tutorial summary, and interviewers discount it on sight.
- Cut to one page. Publish it somewhere public and linkable, and put the same summary at the top of the repo README.
See a worked example
Kavish's one-pager (composite example), cut down from his first three-page draft:
- Problem: support agents at a mid-size retailer answered refund and delivery questions from a shared drive of 4,200 documents. Finding the current policy took about 6 minutes per ticket, and agents quoted retired policies often enough that the team sampled 11 wrong-policy answers in 50 tickets.
- Context: documents were messy exports with duplicates and stale versions; answers had to cite sources; no customer data could leave the team's cloud account.
- Built: a retrieval assistant with a validation gate on ingestion, chunking by document section, cited answers, and a weekly eval run.
- Decisions: chose a smaller, faster model with strong retrieval over a larger model with weak retrieval, trading some answer polish for a p95 latency of 1.9 seconds; chose quarantine over deletion for failing documents, trading storage for evidence.
- Results: eval pass rate on a 120-question golden set rose from 61 to 89 percent; wrong-policy answers in the weekly 50-ticket sample fell from 11 to 2; median time to a cited answer fell from about 6 minutes to under 1 minute.
- Failure: the first version quoted a retired refund window for two weeks because stale documents passed ingestion. The fix was a freshness check and a quarantine queue, not a prompt change.
- Next: connect the assistant to the live ticket queue, which needs the customer's data-processing sign-off.
Notice the shape: every claim has a number or a method attached, the failure is specific, and the next step names what he needs from the customer. That last line is pure FDE, and interviewers notice it.
Next: what the hiring loop actually tests, stage by stage.
Step 4: What the hiring loop actually tests
FDE loops look like engineering interviews and behave like customer simulations. The stages vary by company, but the pattern across firms like OpenAI, Palantir, Databricks and Anthropic is consistent enough to prepare for. Each stage tests a different thing, and confusing them is the commonest way strong builders fail:
- Recruiter screen (about 30 minutes). Tests motivation and fit: why this role, why this company, whether your story hangs together. Your case study's Problem and Results sections are your script. Keep the two-minute version ready.
- Customer roleplay (45 to 60 minutes). An interviewer plays a customer, often a sceptical one with a vague problem and a fixed budget. This tests discovery: asking questions before proposing, handling pushback without folding or bulldozing, and summarising what you heard. It is the discovery skills from the middle modules, performed live. Candidates who open with a solution fail this stage, however good the solution is.
- System design interview (about 60 minutes). Tests design under constraints. You will be given a customer situation, not a blank page: data that cannot move, a latency budget, an existing stack, a deadline. The skill is asking about constraints first, drawing the simple version, then naming tradeoffs as the interviewer tightens the screws. There is no single right architecture. There is a visible reasoning process, or there is not.
- Live debugging (about 60 minutes). You are handed a broken system, very often a RAG pipeline whose answers have gone wrong, and asked to fix it while thinking aloud. This tests method: form a hypothesis, check the cheapest thing first, change one variable at a time. The course rule applies directly: check the data and the retrieval before the prompt, and the prompt before the model. Most planted bugs live in chunking, stale documents or a filter that silently drops results.
- Take-home (usually time-boxed to a few hours). Tests scoped building and writing. The write-up matters as much as the code: state your assumptions, your tradeoffs and what you cut. Respect the time box visibly. Shipping a smaller thing completely, with an honest "what I would do next", beats an unfinished grand design every time.
Your preparation for all five stages is the same raw material: STAR stories mined from the capstone. Prepare four, each two minutes long, each ending with a number:
- The hardest bug. Situation: what broke. Task: what you owned. Action: how you isolated it. Result: the measured fix. In Kavish's build (composite), this is the stale refund window: found by sampling answers, fixed at ingestion, wrong-policy answers down from 11 in 50 to 2 in 50.
- The tradeoff. A decision where both options were defensible, and you can say what you gave up. The smaller model with better retrieval is a good one: polish traded for latency and citations.
- The cut. Something you removed or refused to build, and why. Scope discipline is an FDE survival skill, and loops probe for it deliberately.
- The failure. Something that went wrong on your watch, told without blaming the tools or the customer, ending with the process change it caused. This story also anchors your reference story: brief your references on the same four stories, so what they say and what you say describe the same person.
Practise them out loud, timed. A story that reads well and runs to six minutes will be cut off mid-Result, which is the only part the interviewer is scoring.
Next: the 30 days after this chapter, planned week by week.
Step 5: The 30-day plan after the course
Courses end. Hiring cycles run six to ten weeks. The plan below bridges the gap, and it assumes the proof pack from Steps 1 to 3 either exists or gets built in week one:
- Days 1 to 7: package. Finish the case study, record the demo using the craft rules from Chapter 62, clean the repo, and put all three links in one place: the top of your CV, your LinkedIn profile, and a short public page. One link, three assets, nothing behind a login.
- Days 8 to 14: aim. Pick 10 to 15 roles using the archetype reading from Chapter 2, favouring the postings whose constraints match your capstone. Write the four STAR stories, practise each one out loud twice, and send the first targeted applications, each one referencing a specific line from the posting and a specific number from your case study.
- Days 15 to 21: rehearse the loop. Run one mock of each hard stage: a roleplay with a sceptical customer, a design session where the constraints change halfway, and a debugging session on a deliberately broken retrieval pipeline. Record yourself. The recordings are uncomfortable and extremely effective.
- Days 22 to 30: apply, track, adjust. Send the remaining applications, track every stage in a simple table, and write down every interview question you could not answer well within a day of hearing it. Those questions are your new gap list.
Then close the loop the way this course opened. Go back to Chapter 6, "Your skill-gap map", and re-score your skills matrix honestly against the same roles. The capstone moved some scores a lot: building, evaluating and shipping a real system is worth more than any single chapter. It also exposed gaps the coursework could not, and the interview questions you collected are evidence, not embarrassment. Update the matrix, pick the top two gaps, and let them choose your next build. That is the whole method of this course, and it keeps working after the course ends: build something real, measure it, package the proof, and let the gaps you find set the next round.
Next: a prediction, two quick checks, then the final quiz of the course.
The builds are equal; the evidence is not. Screening is a judgement made under time pressure, and proof of work is what makes a fast judgement possible.
Quick checks
Mix-ups to avoid
- "I need three more projects before I can apply." You need one project packaged three ways. Depth is what the loop tests; volume is what tutorials test.
- "The demo is just a recording of it working." A demo is a customer conversation in miniature. Show the pain, one failure mode and the recovery, and narrate the decisions.
- "A rejection means the build was not good enough." Usually it means the proof was not seen, or one loop stage needs practice. Both are fixable, and the 30-day plan treats them separately.
Recap
- Claims are free and priced accordingly. Proof of work, a case study with numbers, a demo recording and a clean repo, is what gets a builder interviewed.
- FDE hiring loops test customers, constraints and debugging: roleplay, system design with changing constraints, live debugging of a broken system, and a scoped take-home.
- STAR stories from your own build answer most of it, and a 30-day plan plus a re-scored skills matrix keeps the course working after it ends.
Next: that is the course. Before you close the tab, go back to Chapter 6, "Your skill-gap map", and re-score yourself against the roles you want now. The distance between that first map and this one is the truest record of what you built here. Then visit the Review page to replay the whole journey, chapter by chapter, and keep it open while you run the 30-day plan.
Review this chapter in 5 minutes
The three proof assets, the case study skeleton, the loop stages, and the 30-day plan.
Chapter quiz
Four questions. Score 70% or more to mark this chapter complete.